City: NEUQUÉN CAPITAL
rnTerm: 265 days
rnYear: 2002 - 2003
FEATURES:
rnExpansion of the access to Neuquén International Airport, increasing the number of lanes to four. The project length was 300 meters. In this section, the following works were carried out:
- Subgrade, sub-base, granular base, black base, and asphalt concrete pavement separated by H.14-type curbs.
- Paved shoulders.
- Elliptical roundabout, combined with secondary roundabout and channeled intersections.
- Vertical and horizontal signage along the section.
- Construction of sidewalks and lighting for the access road and roundabout.
- Filling, landscaping, and installation of irrigation pipelines.