Electrification of LA 302-303 – Lindero Atravesado Field
Physical Activity Hall in the Parque Industrial neighborhood of the city of Neuquén
Physical Activity Hall in the Confluencia Rural neighborhood of the city of Neuquén
Construction of the Bajada Colorada Transformer Station, associated with the Vientos Neuquinos Wind Farm, in the Collón Curá department, for the generation and distribution of wind energy.
Construction of the provincial railway branch at progression 8550 of the Southern Trans-Andean Railway, including the bridge over Arroyo Covunco.
Electric power supply to Nueva Esperanza Colony, including the installation of 14 km of medium-voltage lines, transformer substations, and low-voltage lines for 336 lots and additional services.
Installation of a new 13.2 kW medium voltage power line in northwest Neuquén City, including overhead and underground cabling, columns, manholes, and distribution transformers.
Comprehensive hydraulic and landscaping improvement project for Durán Stream in Neuquén City, including channel cleaning, flow control infrastructure, bridges, gates, and a new intake connection to the Limay River.
Large-scale hydraulic project to ensure potable water and irrigation in the Confluencia area, Neuquén. Includes canals, aqueducts, gates, filtration systems, and control centers, with major social, agricultural, and economic impact projected through 2030
Water intake and irrigation system project to supply Neuquén cities and foster agro-industrial development. Energy savings and job creation.
Pavement construction in Villa Florencio neighborhood with utility connections and complementary works.
Remodeling of National Route 22, transforming two lanes into four, with bike lanes, lighting, and new drainage systems.
Remodeling of National Route 22, converting it into a four-lane urban road with improved access to Plottier.
Flexible pavement and complementary works on Provincial Route Nº 43, enhancing connectivity between Huaraco and Andacollo
Comprehensive rehabilitation of Provincial Route Nº 17, improving road infrastructure between Picún Leufú, Plaza Huincul, and Añelo.
Expansion and modernization of the treatment plant in Junín de los Andes, enhancing the capacity and efficiency of the wastewater system.
A full remodeling of the treatment plant at the Neuquén Capital Industrial Park was carried out.
Commissioning of existing modules for stable treatment operation
A 5,400 m² building constructed in the city of Neuquén, designed to accommodate a variety of sports activities.
The project involved the construction of the new facility for EPET No. 21, located in the city of San Martín de los Andes, approximately 1,800 meters northwest of the urban area, with a total surface area of 3,400 m².
The project consisted of the construction of the new facility for EPET No. 20, located in the City of Neuquén, Confluencia Department, on Lanín Street between Petróleo and Lago Espejo Streets, covering a surface area of 5,530 m².
A water fountain composed of two pools at different levels, allowing for the formation of a waterfall.
The project consisted of the construction of buildings intended for administrative tasks of the Honorable Chamber
Expansion of the access to Neuquén International Airport, increasing the number of lanes to four.