City: NEUQUÉN CAPITAL
rnDuration: 360 days
rnYear: 2001 - 2003
FEATURES:
rnFlexible pavement work including:
- Preparation of subgrade, construction of sub-base and granular base, black base, and asphalt concrete.
- Demolition and reconstruction of reinforced concrete curbs.
- Complementary works including connections to the domestic potable water and sewage networks, floor grates, access points, sump chambers, and inspection chambers.