City: NEUQUÉN CAPITAL
rnTimeline: 285 days
rnYears: 2018 - 2019
rn
CHARACTERISTICS:
rnThe project involved the installation of the new 13.2 kW medium voltage (MV) line named NE1, located in the northwest area of Neuquén City, along Conquistadores del Desierto Street and the new frontage road of Route 22, between El Tabaco Street and the Pluspetrol roundabout.
rnWorks included MV and public lighting foundations, installation of poles, fittings, and clamps; laying and connecting of overhead MV cables (13.2 kW); construction of underground MV manholes and ducts (13.2 kW); laying and connecting of underground MV cables (13.2 kW); supply and installation of transformer stations (SETs) to power the public lighting network in the area.
rnAlso included was the installation of grounding systems for poles and SETs (ground rods, bare copper cables, terminals, bolts, etc.); installation of poles, fittings, and clamps for the public lighting network; and laying and connecting of low-voltage aerial cables for that network.