The project consisted of the following tasks:

  • Civil works and generator installation
  • Installation of power and control cable conduits and wiring
  • Expansion and modification of the existing main power panel
  • Conduits, wiring, and connections for heater installation
  • Concrete slab and metal shed for the installation of the inflation station
  • Conduits, fiber optic blowing and connections
  • Supply, installation and commissioning of compact transformer substations
  • Supply, construction, testing and energization of a 13.2 kV Medium Voltage Power Line