City: NEUQUÉN CAPITAL - PLOTTIER
rnDuration: 360 days
rnYear: 1999
FEATURES:
rnTransformation of the route, which initially had two undivided lanes, into a four-lane urban road with a central median. The works included:
- Excavation, subgrade, sub-base, and granular base, black base, and asphalt concrete surface in the stretch between Escuela EMETA and the Rotonda de Acceso a Plottier.
- Milling, crack sealing, and reinforcement with asphalt concrete in the section between Rotonda Acceso a Plottier and Progressive 13.416.
- Complete signalization, horizontal and vertical demarcation, and lighting of the section.
- Construction of islands and curbs.
- Natural drainage piping installation, circular and arched, with corresponding drainage works (sumps and inspection chambers).
(JV: R.J. INGENIERÍA S.A - CONSTRUCTORA LAUTEC S.R.L)