City: PLOTTIER - PROV. NEUQUÉN
rnDuration: 840 days
rnYear: 2003 - 2005
FEATURES:
rnTransformation of the route from two undivided lanes into a four-lane urban road. The following works were carried out:
- Excavation and embankment works.
- Subgrade, sub-base, granular base, black base, and asphalt concrete with a central division formed by a median with low-height landscaping.
- Central and collector road lighting with double-mounted lights.
- Irrigation system and paving of shoulders.
- Bike lanes on both sides of the road.
- Replacement of the stormwater channel with concrete piping and corresponding drainage works (sumps and inspection chambers).
- Vertical and horizontal signage.
rn
rnrnrn
(JV: R.J. INGENIERÍA S.A. - CONSTRUCTORA LAUTEC S.R.L)